Mastoor Energy Enquire →
Solar Installation · Karachi & Pakistan

Mastoor
Energy

Solar power & energy storage, installed turnkey.

Sunlight

Fields that drink the light

In motion

The turbines turn with you

One grid

Clean power, delivered

Scroll↓
01 — What We Supply

Solar, storage
& power electronics

01

Solar Panels

Import and supply of high-efficiency mono & bifacial PV modules from tier-one manufacturers — sized for rooftop, ground-mount and utility-scale arrays.

02

Inverters

On-grid, off-grid and hybrid inverters across the full power range — the intelligent core that converts, manages and protects every installation.

03

Lithium Batteries

Import and supply of LiFePO₄ energy-storage systems — long-cycle, deep-discharge battery banks that keep power flowing after dark and through outages.

04

HT & LT Electrification

External high-tension (HT) & low-tension (LT) electrification — distribution lines, transformers, switchgear and grid & substation connections, energised and commissioned for solar plants, industry and facilities.

02 — Installations

Where we
install

Industrial

Industrial

Factories, mills and warehouses — large rooftop & ground-mount arrays that offset heavy daytime loads and stabilise energy costs.

Commercial

Commercial

Offices, retail, hospitals and housing — grid-tied and hybrid systems that lower bills and provide backup through load-shedding.

Governmental

Governmental

Military bases, public buildings and institutional sites — engineered, compliant solar with the reliability government projects demand.

Major Provisions

Solar systems
we’ve delivered

From our largest utility-scale plants to smaller installations

5 MW+On-Grid & Hybrid — Residential, Industrial & Offices
3 MWSolar System — PAF Base Mushaf, Sargodha
2 MWSolar System — Nur Khan Airbase, Chaklala Rawalpindi
1.9 MWSolar System — PAF Base Rafiqi, Shorkot
1.7 MWSolar System — Tez Group, Multan
1.2 MWOn-Grid System — Aijaz Industries, Karachi
750 KWOn-Grid System — ACE 5 Corps, Karachi
560 KWOn-Grid System — H&H Packages, Karachi
500 KWHybrid Solar — Naval Creek Posts, Balochistan + Sindh
500 KWSolar Plant — CMES, Hyderabad
400 KWSolar System — Pakistan Security Printing Corporation
300 KWHybrid System — Jinnah Naval Base Ormara, Gwadar
272 KWNaval Dockyard, Karachi
230 KWSolar Plant — Desert Hawk HQ 18 Div, Hyderabad
150 KWKarachi Port Trust
140 KWChildren School, Hyderabad
130 KWDESTO, Karachi
120 KWOn-Grid — HQ Corps MESS, GE Army, Karachi
100 KWOn-Grid System — Jinnah Lines, Karachi
See projects with site photos →
37+
MW Solar Installed
200+
Projects Completed
3
Grid Configurations
100%
Turnkey Delivery
Sustainability

Power the sun
already sent

Every kilowatt-hour we install is fuel that never burns — quiet, clean energy that pays for itself while cutting carbon for decades. That is the return we engineer for.

Trusted by Pakistan’s armed forces, government & industry
Pakistan ArmyPakistan ArmyPakistan NavyPakistan NavyPakistan Air ForcePakistan Air ForceFWOFWOKarachi Port TrustKarachi Port TrustDHADHAPakistan ArmyPakistan ArmyPakistan NavyPakistan NavyPakistan Air ForcePakistan Air ForceFWOFWOKarachi Port TrustKarachi Port TrustDHADHA
NHANHACODCODGovt of SindhGovt of SindhMinistry of EducationMinistry of EducationCAACAAFBRFBRNHANHACODCODGovt of SindhGovt of SindhMinistry of EducationMinistry of EducationCAACAAFBRFBR
Solar in Karachi · FAQ

Solar installation
in Karachi

Mastoor Energy works from its head office on Shaheed-e-Millat Road, Karachi, and installs solar for homes, businesses, industry and government sites across Karachi, Sindh and the rest of Pakistan. These are the questions we hear most. For what is included in a system, see solar installation in Karachi.

01 · FAQ

Do you install solar for homes in Karachi?

Yes. Alongside our industrial and government plants, we have delivered more than 5 MW of on-grid and hybrid systems for homes, factories and offices. We size each system to your load and roof, and supply the panels, inverter and batteries ourselves.

02 · FAQ

On-grid, hybrid or off-grid: which do I need?

On-grid systems power your building alongside the grid, with no batteries, and suit sites that mainly want lower bills. Hybrid systems add lithium batteries so power keeps flowing through load-shedding. Off-grid systems run entirely on solar and storage where the grid is weak or absent. We install all three. Read the full comparison.

03 · FAQ

Are you approved to install solar in Pakistan?

Mastoor Energy is enlisted with the Alternative Energy Development Board (AEDB) in the No-Limit Category. The group is also MES approved and holds an Electrical Contract License from the Government of Sindh.

04 · FAQ

Which solar projects have you done in Karachi?

Our Karachi installations include a 1.2 MW on-grid system at Aijaz Industries, 750 KW at ACE 5 Corps, 560 KW at H&H Packages, 272 KW at Naval Dockyard, 150 KW at Karachi Port Trust, 130 KW at DESTO and 100 KW at Jinnah Lines. Beyond Karachi we have built plants of up to 3 MW, at PAF Base Mushaf, Sargodha. See all solar projects.

05 · FAQ

Do you handle the grid connection?

Yes. Our team carries out the external HT and LT electrification, including distribution lines, transformers, switchgear and grid and substation connections, then energises and commissions the plant.

Enquire

Go solar
with us

Contact Mastoor Group →
Head Office

Office #7 & 8, Near New Jamia Memon Masjid,
Shaheed-e-Millat Road, Karachi